|
|
|
| Used as trestle and as scaffolding element. |
| |
|
|
|
| Used as trestle and as element which ends a scaffolding. Can receive a removable bar. |
| |
|
|
|
| Used as trestle and as element which ends a scaffolding. |
| |
|
|
|
| Used as a 2 m scaffolding element with free way and sliding removable bar to adjust the walkboard according to the difference of level of the ground. |
| |
|
|
|
| Used as a scaffolding element, generally placed at the extremities of the structure. |
| |
|
|
|
| Only used on the trestles ; made to support heavy loads. |
| |
|
|
|
| Used on the GTP4 / GTP5 / GTP7 ; enables to perfectly make up the levels on the uneven grounds. |
| |
|
|
|
| Enables to perfectly make up the levels on the uneven grounds. |
| |